Vacuum excavation: how it works, costs and when to use it

A vacuum excavator loosens soil with a compressed-air lance or water jet and sucks it up a wide hose into a debris tank. HSE guidance lists it as a safe way to dig around buried services and to dig trial holes. Lorry-mounted units typically cost about £800–£1,200 a day. Find local vacuum excavation.

HSE guidance
a safe way to dig near services
Typical cost
about £800–£1,200 a day
Lorry debris tanks
about 2–12 m³
Operator training
NPORS N021 or CPCS A78
Won't dig
concrete
Debris tank Trial hole Services exposed Suction hose 6 ft
A lorry-mounted vacuum excavator exposes buried services in a trial hole without a mechanical bucket. Not to scale.

Vacuum excavation suppliers

Search your site postcode to see who covers it, check their paperwork and contact them directly.

See all vacuum excavation suppliers
We're adding vacuum excavation suppliers now. Tell us what you need and we'll point you to a local option, or list your business.

Vacuum excavation (vac ex) loosens the ground with a compressed-air lance or water jet and sucks the soil up a wide hose into a debris tank on a lorry or trailer. HSE guidance lists it as a safe way to dig around buried cables and pipes and to dig trial holes. Lorry-mounted units with operators typically cost about £800 to £1,200 a day.

How vacuum excavation works

  1. Locate services firstRecords and a utility survey come before any digging, whatever method you use.
  2. Loosen the groundAn air lance (dry) or water jet (hydro) breaks up the soil without the force of a metal bucket.
  3. Suck it upPowerful fans pull the loose soil up the hose, typically 200–250 mm wide, into the debris tank.
  4. Expose the servicesCables and pipes are uncovered so their position and depth can be seen.
  5. Tip or backfillThe spoil is tipped at a permitted site or back into the hole.

Air or hydro excavation?

Most jobs

Air (dry) excavation

Compressed air loosens the soil. The spoil stays dry, so it's easier to handle.

Hard or clay ground

Hydro (wet) excavation

Pressurised water cuts through tough ground, but it turns the spoil into slurry, which needs specialist disposal.

When to use it

  • Digging near buried services: HSE's HSG47 lists vacuum excavation among safe methods of excavating.
  • Trial holes: HSG47 says trial holes to confirm services can be dug with suitable hand tools or vacuum excavation.
  • Congested excavations: HSE says it can be very effective where mechanical digging and hand tools are difficult.
  • Tight access: the hose can be extended well away from the vehicle to reach back gardens, basements and yards.
Know its limits

HSE says vacuum excavation has limitations and won't work on all ground or materials, such as concrete. Hard surfaces need breaking out first, keeping power tools at least 500 mm from marked services.

Machine types and sizes

TypeDebris tankGood for
Trailer or compact unitabout 0.2–0.35 m³Small trial holes, pavements, tight spots; towed by a van
City lorry (about 14–16 t)about 2–3.5 m³Town streets and restricted access
Large lorry (about 18–32 t)about 4.5–12 m³Bigger digs, trenches and long shifts

Lorry booms typically reach about 3.5–6 m, and hose extensions let crews work much further from the vehicle.

What vacuum excavation costs

Most firms quote per job. Examples from published cost guides and hire rates:

£800–£1,200a day for a lorry-mounted unit
£1,000+a day with two operators, from one hire firm's published average
£1,500+a week for a compact trailer unit without an operator, on a trade account
  1. Machine sizeBigger tanks mean fewer trips to tip, but cost more a day.
  2. OperatorsMost lorry units come with one or two trained operators.
  3. DisposalTipping spoil, and especially hydro slurry, is often charged on top.
  4. Location and permitsWork in the road needs permits and may need traffic management.

The spoil is waste

Registered carrier Required

Spoil taken off site must go with a registered waste carrier to a permitted site, with a waste transfer note.

Waste codes

Usually 17 05 04 (soil and stones), or 17 05 03* if it contains hazardous substances. See our soil testing guide.

Hydro slurry Liquid waste

Liquid waste can't go to landfill. In England, a regulatory position (RPS 275) allows wet utility excavation waste to be solidified on site with non-waste absorbents before it goes to a permitted site.

Digging in the road

Vacuum excavation in the highway counts as street works. Utility firms work under their own permits; anyone else needs a section 50 licence from the council, and the site must have a qualified street works operative on site at all times and a qualified supervisor. See our traffic management guide for permits and notice periods.

Operator training

Operators can hold the NPORS N021 Suction Excavator category (a 5-day course) or the CPCS A78 Vacuum Excavator category, which covers underground and overhead services, confined areas, noise and dust, and the danger of damaging services with the nozzle.

Questions to ask a vacuum excavation company

  • Air or hydro, and which suits my ground?
  • What size machine and tank will you send, and does it fit the access?
  • Is the price per day or per job, and does it include operators and tipping?
  • Are your operators NPORS or CPCS trained, and street works qualified if we're in the road?
  • How will the spoil or slurry be disposed of?
  • Will you need a utility survey done first, or can you arrange one?

Prices in this guide are typical ranges from suppliers' published price lists and cost guides. They change and vary by area, so always confirm the price with the supplier before you book. Rules, fees and tax rates are checked against official sources.

Vacuum excavation questions

What is vacuum excavation?

A way of digging where an air lance or water jet loosens the soil and powerful suction lifts it up a hose into a debris tank on a lorry or trailer. It's used to expose buried services and dig trial holes without a mechanical bucket.

How much does vacuum excavation cost?

Published cost guides and hire rates put a lorry-mounted unit at about £800 to £1,200 a day, and one hire firm gives an average of just over £1,000 a day with two operators. Most firms quote per job, and tipping is often extra.

Is vacuum excavation safe near cables?

HSE's guidance HSG47 lists vacuum excavation among safe methods of excavating and for digging trial holes. Services still need to be located first, and HSE notes it won't work on all ground or on concrete.

What's the difference between air and hydro excavation?

Air excavation loosens soil with compressed air and leaves dry spoil. Hydro excavation uses pressurised water, which cuts harder ground but creates slurry that needs specialist disposal.

Do I need a permit for vacuum excavation in the road?

Yes. Work in the highway is street works. Utility firms use their own permits; anyone else needs a section 50 licence from the council, with a qualified street works operative and supervisor.

What training do vacuum excavator operators need?

Recognised operator categories are NPORS N021 Suction Excavator, a 5-day course, and CPCS A78 Vacuum Excavator.